The red front and rear square beams connect through side rails to support the mounted assemblies.
Moist pre-sowing ground shows hitch brackets and points behind a tractor.Subsoil Loosening Across Four Fields
These scenes show the same red mounted subsoiler behind a tractor in a residue-covered field, a compacted headland, a moist pre-sowing field and rough reclamation ground. Each horizontal view keeps the double-beam frame, central hitch brackets, clamp plates and the visible curved shanks aligned with the tractor travel path.
Residue field shows red beams, clamp plates and curved shanks loosening soil.
Compacted headland work shows the red frame and shanks disturbing soil.
Moist pre-sowing ground shows hitch brackets and points behind a tractor.
Rough reclamation ground shows red beams and black shanks crossing soil.
Residue field shows red beams, clamp plates and curved shanks loosening soil.
Compacted headland work shows the red frame and shanks disturbing soil.
The red front and rear square beams connect through side rails to support the mounted assemblies.
The red central plates provide the visible connection area for the tractor hitch arrangement.
This black curved shank is shown removed from its corresponding clamp position for identification.
The second black curved shank matches the neighboring component and retains the same mounting holes.
The third black curved shank is aligned below its frame position with its lower connection visible.
The fourth black curved shank is displayed at the right side of the numbered component group.
The first black rectangular point aligns below the first removed curved shank in the structure view.

Video demonstration of the deep tiller operating in a lateral configuration.
01:24Video demonstration of the deep tiller operating in a lateral configuration.
01:24Video demonstration of the deep tiller operating in a lateral configuration.
01:24Video demonstration of the deep tiller operating in a lateral configuration.
Our team is ready to advise you on the best product configuration and procurement plan.
info@eascoutia.com400 158 5899Every formal image uses the same red double-beam frame, central hitch brackets, clamp plates, curved black shanks and rectangular points.
Check the visible hitch connections, frame joints, clamp plates, bolts, bearing connection, shanks and lower points.
The purchasing plan lists the color as designated color.
The scenes show a residue-covered field, a compacted headland, moist pre-sowing soil and rough reclamation ground.
Communicate special requirements based on actual needs so the requested details can be reviewed before confirmation.